Malaysia

Singapore open to fresh HSR proposals from Malaysia: Lee

Matter can be reconsidered anew, says PM

Updated 4 years ago · Published on 29 Nov 2021 3:39PM

Singapore open to fresh HSR proposals from Malaysia: Lee
Prime Minister Lee Hsien Loong (right) says the transport ministries from both countries will discuss the matter and Singapore looks forward to receiving more details from Malaysia. – PMO pic, November 29, 2021

KUALA LUMPUR – Singapore Prime Minister Lee Hsien Loong said the republic is open to fresh proposals from Malaysia on the Kuala Lumpur-Singapore High-Speed Rail (HSR) project although both countries have previously agreed to terminate the project.

Lee said the transport ministries from both countries would discuss the matter and Singapore looked forward to receiving more details from Malaysia.

“Prime Minister (Datuk Seri Ismail Sabri Yaakob) has suggested the revival of discussions on the HSL, and I responded to the PM that Singapore and Malaysia had previously reached an agreement to terminate the HSR project, which had been amicably settled and closed.

“Nevertheless, Singapore is open to fresh proposals from Malaysia on the HSR project, and the two transport ministries will discuss the matter.

“Singapore looks forward to receiving more details from Malaysia so that we can study them and consider the matter again starting from a clean slate,” he said.

Lee was speaking at a joint press conference with Ismail Sabri today, which was also streamed live via his official Facebook page.

On January 1, Malaysia and Singapore jointly announced the termination of the HSR project, as both countries failed to reach an agreement on changes proposed by Malaysia before the project agreement lapsed on December 31, 2020. 

In March this year, Malaysia announced that it had paid SG$102.8 million (RM318.4 million) to Singapore for costs incurred in the development of the HSR project and in relation to the extension of its suspension.

Meanwhile, on the Johor Baru-Singapore Rapid Transit System (RTS) Link project, Lee said the construction of the project was ongoing, and both countries looked forward to the system commencing passenger services by end-2026.

The RTS Link is a 4km cross-border rail project that links the Singapore terminus at the Woodlands North station to the Malaysia terminus in Bukit Chagar, Johor Baru.

It will support a peak capacity of 10,000 passengers per hour in each direction.

Meanwhile, Ismail Sabri later told reporters in Singapore that discussions on reviving the HSR project would be carried out by the two transport ministries and the new proposal would be brought to the cabinet.

“This is still at a very preliminary stage. We will study it in detail. As the previous agreement was terminated, revisiting the project would require a new agreement,” he said. – Bernama pic, November 29, 2021

Related News

World / 1w

Rat spotted scurrying around on Singapore East-West Line MRT train (video)

Malaysia / 1w

Covid-19 cases in Malaysia stable, no deaths recorded this year – MOH

Off beat / 1w

Developer disputes Penang’s reasons for dismissing RFP

Malaysia / 3w

Singaporean couple burnt to death after Ferrari crashes, goes up in flames (video)

World / 4w

Malaysian man admits to setting fire to door of Singapore flat over S$2,500 job

World / 1mth

Malaysian man, 33, arrested for slapping elderly woman, others at Singapore Life Church

Spotlight

Business

Tycoon Vincent Tan trims BCorp stake further in RM115m share sale

Malaysia

UMNO’s solo gamble in Johor: A show of strength or risky miscalculation?

By The Vibes Says

Malaysia

Nik Aziz’s grandson allegedly slapped by senator: Father ready to take case to court

Malaysia

Lorry driver jailed a day, fined for making obscene gestures, dangerous driving (video)

Malaysia

PKR leader defends MyKhas access suspension for PJ, Subang MPs, cites ‘political choices’

Opinion

Social media set to dominate Johor polls as election kingmaker

Malaysia

Man charged in Butterworth parang attack case that left victim fearing permanent disability

Malaysia

Teen mothers must return to school, says Fadhlina as education remains priority

Malaysia

Penang water tariffs to increase from July 1 after year-long deferment

You may be interested

Malaysia

King Sultan Ibrahim urges new MACC chief to uphold highest integrity in fight against corruption

Malaysia

TNB central to Malaysia’s “just transition” as AI boom drives energy demand surge

Malaysia

MACC officer tells court Penang Tunnel bidder allegedly gained early edge through private briefings

Malaysia

Viral list of PRN candidates is fake - BN Johor

Malaysia

Jewellery shop among six premises destroyed in fire (video)

Malaysia

Fadillah warns of finite fossil fuels, global volatility and rising demand

Malaysia

Teen mothers must return to school, says Fadhlina as education remains priority

Malaysia

Two sisters die trapped in Johor house fire as escape routes cut off by flames